Every servicing, testing and inspection interval for the equipment in a UK dental practice, on one page — with the statutory obligations clearly separated from manufacturer recommendations. Built to be printed and kept in the compliance folder.

Read this first. Several of the intervals below are set by documents specific to your practice — most importantly your Written Scheme of Examination, which determines your pressure vessel inspection frequency. Where that is the case it is marked. This calendar is a planning aid, not a substitute for your own WSE, your manufacturer schedules, or advice from your Radiation Protection Adviser.

Daily

TaskEquipmentWhoStatus
Automatic control testAll benchtop sterilisersOperatorStatutory
Steam penetration test (Helix or Bowie-Dick)Vacuum sterilisers onlyOperatorStatutory
Record every sterilisation cycleAutoclavesOperatorStatutory
Drain condensate from receiverCompressorPracticeEssential
Flush suction linesSuction systemPracticeManufacturer

The condensate drain is the one that quietly stops happening. It takes under a minute, it is nobody's named job, and it is behind a large share of the moisture faults we attend.

Weekly and monthly

TaskEquipmentIntervalStatus
Deep clean of suction lines and trapsSuction systemPer manufacturerManufacturer
Check amalgam separator levelAmalgam separatorPer manufacturerManufacturer
Safety and function checksAutoclavesWeeklyPer HTM 01-05
Visual inspection of hoses and fittingsChairs, compressorMonthlyGood practice

Annual and periodic

This is the layer that gets missed, because each item sits with a different supplier and renews on a different date.

TaskEquipmentIntervalStatus
Pressure vessel inspection (PVI)Compressor, autoclaveAs set by your Written Scheme of ExaminationStatutory — PSSR 2000
Compressor service and filter changeCompressorAnnuallyManufacturer
Autoclave validationAutoclavesAt installation, then annuallyStatutory
Washer-disinfector validationAWDAt installation, then annuallyStatutory
X-ray performance testingAll X-ray equipmentAt regular intervals, and after any maintenance capable of affecting performanceStatutory — IRMER17
Critical examinationNew or modified X-ray equipmentBefore first clinical useStatutory — IRR17
Amalgam separator serviceAmalgam separatorAnnually, with written proofStatutory
Suction system serviceSuctionAnnuallyManufacturer
Dental chair serviceChairsTypically 6–12 monthsManufacturer
PAT testingPortable electrical equipmentRisk-basedGood practice

Records: how long to keep what

RecordRetention
Autoclave cycle recordsMinimum two years
Pressure vessel inspection certificatesKeep current certificate; retain history
Amalgam separator service proofRetain as compliance evidence
X-ray testing and critical examination reportsRetain for the life of the equipment
Equipment service reportsRetain for the life of the equipment

The three that catch practices out

1. Assuming the service covers the pressure vessel inspection

They are separate pieces of work with separate certification. A practice can be diligently servicing its compressor every year and still have no valid PVI. Check your contract names both.

2. Not knowing what the Written Scheme of Examination says

The WSE, prepared by a competent person, is what sets your inspection frequency. There is no single universal interval that applies to every practice — the only one that applies to you is the one in your document. If you cannot lay hands on it, that is the first thing to fix.

3. Treating X-ray testing as a single annual event

IRMER17 requires testing before first clinical use, at regular intervals thereafter, and after any maintenance capable of affecting performance. That last clause catches practices out: a repair can trigger a re-test obligation that nothing in the annual calendar will remind you about.

Want this consolidated onto one schedule?

Most practices are running six schedules across four suppliers, which is exactly where gaps appear. Tell us what equipment you have and we will map it onto a single calendar — whether or not you use us to service it.

Request a quote or site survey

Sources: Pressure Systems Safety Regulations 2000; Ionising Radiations Regulations 2017; Ionising Radiation (Medical Exposure) Regulations 2017; HTM 01-05; CQC guidance on validation of decontamination equipment; Environmental Protection (Control of Mercury) Regulations. Intervals summarised for planning purposes — always confirm against your own documentation.